2009 SCG Frequently Asked Questions
|
 |
 |
 |
 |
| General FAQ |
|
 |
I have forgotten my user ID and/or password. Who do I contact to get that information? |
|
|
|
If you are the Primary Contact for your department's grant(s), and you have forgotten the user ID and/or password, you can use the forgot password utility available on the login screen (the screen that appears when you click on e-grant application). Click forgot password and answer the two security questions; then submit your request. The screen should indicate you successfully submitted your request and a temporary password is being e-mailed to your address. Check your e-mail and retrieve the user ID and temporary password. If the message is not there, look in your junk mail file. If it is not in your junk mail file then your e-mail address is not compatible with the DHS system. You will have to set up a new e-mail account. You may want to use the free e-mail accounts such as Yahoo, Hotmail, etc.
If you are unable to answer the security questions, or your primary contact e-mail address has changed, you will need to follow the procedure outlined in the FAQ, "How do I gain access to my department's previous year's application when the previous primary contact is no longer available or does not remember the user ID and password?"
|
|
|
 |
How do I gain access to my department's previous year's application when I am going to be the primary contact on the new application and I do not know the user ID and password from the previous year's application (i.e., lost password, previous contact is no longer available)? |
|
|
|
Send a letter explaining why you need this information, and if you also need to change the Primary Contact information. Please be aware changing the Primary Contact on one grant will cause the Primary Contact to be changed on all other department grants submitted under the same user ID. The letter must be on fire department letterhead and signed by the Fire Chief of the department. To expedite this change you can fax a copy of the letter to Annette Robinson at 1-866-274-0942.
After faxing the letter to Annette Robinson, please mail the original letter to:
DHS/FEMA/Grant Programs Directorate
Assistance to Firefighters Grant Program
Annette Robinson - Room 5066D
Tech World Bldg - South Tower 5th Floor
500 C Street, SW
Washington, DC 20472
The following information must be included in the letter:
- Grant number
- Previous primary contact person's name
- Explanation of why access to the grant is needed
- New contact person's name
- New contact person's mother's maiden name
- New contact person's date of birth
- New contact person's e-mail address
- Two phone numbers for the new contact person
A mailed letter may take two weeks to process. However, soon after faxing the letter to Annette Robinson, you will receive an e-mail from Pinky Sheets telling you she has updated the system and placed your name on the grant as the main contact person. You will also receive an automated e-mail from EOPS@dhs.gov with your user ID and temporary password.
If you do not receive this automated e-mail from EOPS@dhs.gov within two days of faxing your request and receiving the e-mail from Ms. Sheets, you should look in your junk mail file. The electronic e-mails are sometimes filtered and sent directly to junk mail.
If you are still unable to get a new user ID and password, go onto the Web site at www.firegrantsupport.com and choose e-grant application. You will get an application sign-in screen. Click on forgot password, answer the two security questions and submit your request.
The screen should indicate you successfully submitted your request and a temporary password is being e-mailed to you. Go into your e-mail and retrieve the user ID and temporary password. Again, if the message is not there, look in the junk mail file. If it is not in your junk mail file then your e-mail address is not compatible with the DHS system. You will have to set up a new e-mail account. You may want to use the free e-mail accounts such as Yahoo, Hotmail, etc.
When you click on submit, if you get an error message indicating you gave incorrect information, you need to call Annette Robinson (202) 786-9626.
Please note: This information can only be changed by authorized personnel.
|
|
|
 |
I have not received any e-mails from the Program Office, what should I do? |
|
|
|
There are many reasons why you may not have received any e-mails from the AFG system. Some e-mail services such as Hotmail, Yahoo, SBCGlobal or MSN have a tendency to place e-mails from us (dhs.gov) in the junk mail folder of the e-mail program. You can remedy this problem by allowing our e-mail addresses to be accepted by your e-mail provider/program. Different programs have different procedures, so check with your e-mail provider for details on how to allow e-mail addresses. The e-mail address always has a dhs.gov extension. The following e-mail addresses should be allowed:
eops@dhs.gov
afg@dhs.gov
firegrants@dhs.gov
Other e-mail programs that are within a local government or state government, for example, joe.smith@skokie.il.us or pinky@parkland.cc.ca.us , have a tendency to block dhs.gov e-mails entirely. If your e-mail is a .us account, please speak with your e-mail provider or your systems administrator and request they allow e-mails with the dhs.gov extension or tell them to allow e-mails from the following addresses:
eops@dhs.gov
afg@dhs.gov
firegrants@dhs.gov
|
|
|
 |
I have had problems with my e-mail account, and I think I may have missed some e-mails from the AFG program. |
|
|
|
Copies of e-mails that have been sent to you by the AFG system are stored in your online e-grant Mail Center. You can logon to the online e-grant system, and click on the Mail Center link on the status page. There is a link to view Old Messages in addition to the ability to view new messages. |
|
|
 |
How can I change the personal contact information on my grant? |
|
|
|
For the Primary Contact – There can be only one Primary Contact for your department/agency.
Changing the Primary Contact on one grant will cause the Primary Contact to be changed on all other department grants submitted under the same user ID. If you do not wish to do this, consider changing Alternate Contact information for a particular grant instead (see next paragraph). To update personal information such as Primary Contact name, address, phone numbers, e-mail address, or change password, grantees should log into their grant and at the Status screen click on Edit Profile , which is located at the upper middle part of the screen. The page that comes up will allow you to update any personal information that has changed. Type in the updated personal information and click Save at the bottom of the page. A note will state, "Your profile has been updated. Thank You." To make the changes permanent, you must log out of your application for the new information to take effect. To do this, click on the Authorized Applications link on the upper left-hand side of the "Thank You" page, and then click on Firefighter's Grants on the new page so the new information will be set and updated.
For Alternate Contacts – Alternate Contacts can differ from grant to grant if your department/agency has more than one AFG Grant. To change the Alternate Contact name, or update any alternate contact personal information, grantees must log into their grant. From the Status screen, select Manage Grant from the drop-down menu in the Action field. Click on Update Alternate Contacts on the menu bar on the left side of the screen. Type in the updated personal information and click Save and Continue at the bottom of the page. As this request changes information that is contained within the actual grant application, it is processed as a Revision Request by Grants Management staff and must be entered manually. The updated information may not appear for several weeks.
|
|
|
 |
How are grant applications reviewed? |
|
|
|
The evaluation criteria are listed in that year’s Program Guidance. Review the Program Guidance and focus on these criteria in order to develop a competitive application for panel reviews. All eligible applications go to panel reviews. |
|
|
 |
Where should I send letters of support from the community, political leaders, and others for my department's application? |
|
|
|
Letters of support should be sent to:
Ms. Elizabeth M. Harman, Assistant Administrator
DHS/FEMA/Grants Program Preparedness
Tech World Building – 9th Floor South Tower
800 K Street, NW
Washington, DC 20472-3620
Fax 202-786-9938 |
|
|
 |
Why do I need a DUNS number? |
|
|
|
Since October 1, 2003, the Federal Government has required all applicants for federal grants and cooperative agreements, with the exception of individuals other than sole proprietors and foreign entities, have a Data Universal Numbering System (DUNS) number.
The Federal Government uses the DUNS number to better identify related organizations that are receiving funding under grants and cooperative agreements, and to provide consistent name and address data for electronic grant application systems. Additional information about DUNS numbers can be found on the D&B Web site: http://fedgov.dnb.com/webform.
The process is free. If you have already registered for a DUNS number, you must use the same number for every application. |
|
|
 |
How do I apply for a DUNS number? |
|
|
|
You can obtain a DUNS number within 24 hours by calling 1-866-705-5711. A DUNS number can also be requested online; however, D&B estimates it may take 2-3 weeks to process online orders. We strongly encourage you to register for this number prior to the application period. |
|
|
 |
When I apply for a grant, do I have to provide my bank account number? |
|
|
|
Yes. You must provide your bank account number and routing number for our records and to facilitate funds transfer if you receive an award. The Website is on a secure server. Applicant information is not released to anyone. We must have a current routing number. If you are concerned about security, contact the Help Desk at 1-866-274-0960. |
|
|
 |
My bank account number is larger than 15 digits and the application has space for only 15 digits. What should I do? |
|
|
|
Enter the first 15 digits of your bank account number. |
|
|
 |
What is a bank routing number and do I need one? |
|
|
|
The bank "routing number" is a multi-digit set of numbers that correlate banks and accounts. Every bank has multiple routing numbers that are used to determine how money is placed into accounts. The routing number is actually part of your 15 digit account number. However, the type of account you have currently set up may not be suitable for transferring grant funds. Please check with your bank and confirm your account is set up to accept wire transfers on an "ACH" basis. The specific routing number you need to include is the routing number your bank uses to make wire transfers on a next day availability basis. This routing number is referred to as the "ACH routing number" (Automated Clearing House). Accounts set up as Savings accounts and/or money market accounts cannot be used for the purpose of transferring grant funds. Additionally, the listed "Payee" and “Signature" on the account must be the same as those designated on the account. |
|
|
 |
Can I insert a picture or graph into my narrative? |
|
|
|
No. Photos, charts, graphs, or other computer graphic files (.jpg, .gif, etc.) may not be imported into your application. |
|
|
 |
Can I print and mail an electronic application? |
|
|
|
No. We do not accept any printed versions of the electronic applications that are mailed in. |
|
|
 |
Can I type my narrative using word processing software and paste it into the space allowed for the narrative portion of my grant? |
|
|
|
Yes. However, remember only five pages are allowed, and any graphics, tables or other text enhancements (bullets, etc.) may not transfer to the text box area provided in the application. |
|
|
 |
Can I use my password from a previous grant application? |
|
|
|
Yes. It is preferable you use the same user ID and password you used for a previous application, especially if you won an award in a previous program year. |
|
|
 |
Does the application software have a time-out feature? |
|
|
|
Yes. The application times out after 20 minutes if there is no activity. If you have not clicked Save and Continue or clicked another link for 20 minutes, the application session will end, and all unsaved data will be lost. |
|
|
 |
How will I know if my electronic application was received? |
|
|
|
Upon successful submittal, the online application will provide a confirmation page you can print and keep on file pending award determination. We recommend you write your login information on this confirmation page so you can keep them together. |
|
|
 |
If I do not have access to a computer, will I still be able to apply? |
|
|
|
We strongly encourage applicants to apply online. All you need is Internet access from any computer. Since you create a user ID and password, you can log in from anywhere and work on the application. You can save it and return later to continue working on the application from any computer that has Internet access.
If you must apply by paper, call our Help Desk at 1-866-274-0960 to request a paper application be mailed to you. See the Program Guidance for information regarding the submittal dates. Late or incomplete applications will not be accepted.
|
|
|
 |
Will DHS fax or e-mail to me a copy of the application form? |
|
|
|
No. We will not fax or e-mail an application. If an applicant does not have access to the AFG Web site via the Internet, the applicant may contact us directly to request the application by mail. Those applicants interested in receiving an application by mail can call 1-866-274-0960. |
|
|
 |
Where do I send a paper application? |
|
|
|
Applications must be received at the address below by the deadline. See the Program Guidance for information regarding the submittal dates.
U.S. Fire Administration Grant Program Technical Assistance Center
16825 South Seton Avenue
Emmitsburg, Maryland 21727-8998
Faxed applications will not be accepted.
Remember to send the application early enough to ensure it is received by the deadline.
|
|
|
 |
Will you acknowledge receipt of my application packet? |
|
|
|
Confirmation of receipt of paper applications will only be provided if the applicant submits a self-addressed stamped envelope inside the paper application packet. Confirmation of application receipt will not be given over the phone. |
|
|
 |
Do we receive a notification our grant application has been received and is being considered? |
|
|
|
Yes. When you apply electronically, you receive an e-mail confirmation of receipt for your grant application. If you apply using a paper application, you may only receive confirmation of receipt if you send your application by private courier or with a return receipt requested via the U.S. mail. |
|
|
 |
When will I hear about the disposition of my application? |
|
|
|
Award packages are sent electronically to the grantees. As a courtesy to Members of Congress, we provide advance information about awards, so that, at their discretion, they can inform their constituents prior to our official notification. We expect the issuance of award decisions on all applications will continue through most of the year. Decisions regarding applications that cannot be supported with grant funds are also issued electronically in batches throughout the year. If electronic notification is ultimately unsuccessful, we will send the applicant a letter of notification. |
|
|
 |
What are the hardware and software requirements for accessing and filing the grant application online? |
|
|
|
Most computers work with the application without difficulty if they have access to the Internet and have a web browser installed. Both Netscape and Internet Explorer web browsers will work if they are version 4.0 or higher. |
|
|
 |
Will preference be given to those who applied for Fire Grants last year and didn't receive them? |
|
|
|
No. This is a competitive grant program. We will view all applications independently. Applicants whose requests are most consistent with the priorities in the program guidance who provide the best narrative explaining the project with the project's budget details, demonstrating financial need, showing the best cost-benefit ,and showing the most significant effect on the ability to protect life and property will score the highest in the competitive grant process. |
|
|
 |
If I decline an award, will that be held against me if I apply for future funding? |
|
|
|
An applicant who declines to accept a grant during negotiation would not be penalized for declining the award. However, we would consider the grantee to be a poor performer if they accepted an award and subsequently returned it because they cannot fulfill the grant requirements. This does not mean the poor performing grantees are precluded from applying for future assistance. It merely means past performance is taken into account prior to awarding any new grants. Prior performance has always been a consideration for funding. |
|
|
 |
Is there a penalty for returning funds or excess funds? |
|
|
|
No. There is no penalty for returning funds. However, it is our preference grantees expend all awarded funds on eligible expenditures including fire prevention activities. |
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| Application Questions |
|
 |
When was the date for the enactment of the ARRA? We need that information in order to cite health code violations. |
|
|
|
February 17, 2009 |
|
|
 |
We are planning to apply for a Fire Station Construction grant, but we are concerned that it will not be competitive because the cost of construction is much higher in our region than it is some other areas of the country. How will our application be competitive with the applications from areas where construction costs are lower? |
|
|
|
We are fully aware of the regional cost differences and are making suitable adjustments. That is why we have construction officials on staff from various parts of the country to technically review applications. As long as your project meets the funding priorities of the grants, demonstrates a strong cost-benefit, justifies financial need, meets the needs of your community and is a viable project, your application will be competitive.
However, it is critical that you justify your method of determining your project costs. We suggest you use "RS Means" or some other estimating software. If awarded, you will be required to provide documentation including, contracts, plans, bid specs, etc.
|
|
|
 |
The program guidance indicates, "Panelists review each application in its entirety and rate the application according to the established evaluation criteria. How will applications with more than one project be scored? Along the lines of the AFG, if one activity is a very low priority, does that low priority item decrease the overall score? Or, like Fire Prevention/SAFER application scoring, is there more flexibility and independence in scoring each project? |
|
|
|
Each project will have to be fully justified in the narrative. Some applications may have multiple projects that are similar (eradication of mold in 20 stations) and would/could be handled via a single justification. But requesting a renovation to one station and building a new station on one application would require specific justification for each project. Each application will be evaluated in its entirety, and the lack of adequate justification for one of several projects should have an adverse affect on the evaluation. However, if the panel thinks the application has merit "except project A," then the Program Office may fund the application – with the exception of project A. |
|
|
 |
If a state agency is applying for a fire station grant, what unemployment rate do they use? |
|
|
|
The unemployment rate should be the rate in the county where the fire station will be constructed. Applicants can obtain that information from the Bureau of Labor Statistics Web site: http://data.bls.gov/map/servlet/map.servlet.MapToolServlet?survey=la . Applicants may only use the unemployment statistics from this Web site for their SCG application. |
|
|
 |
Can our department apply for funding to consolidate stations? |
|
|
|
As long as your proposed consolidation will improve response times based on NFPA 1710 or 1720 and incorporate the requirements for NFPA 1500, it is eligible for funding. |
|
|
 |
We are applying for a Fire Station Construction grant for our local fire department. Are there any special requirements we need to adhere to in our preparation of the SCG application? |
|
|
|
Yes. First you need to ask your fire department's leadership staff if they have ever applied for any other AFG program grant. If so, you must acquire and use the department's user ID and password they used for their previous AFG Program grant applications. |
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| Construction Requirements |
|
 |
What if a grantee needs to start a project because their locality has seasonal construction needs, i.e., no construction could take place in the winter due to severe amounts of snow? |
|
|
|
SCG will not fund projects that have broken ground prior to the award date. This restriction is due to the fact all projects require our ability to conduct an environmental assessment prior to construction. If construction has started, then we are unable to conduct a proper assessment. |
|
|
 |
Are all SCG projects subject to "green requirements"? There are three or four levels. Will they have to pass through all levels of the green certification? |
|
|
|
The requirement to report on any/all "green" initiatives applies to all SCG grants. The highest level of green is not required, but the more ecological initiatives incorporated the better. These reporting requirements do not apply to applicants, only grantees. The Program Office will investigate further and provide additional guidance on the exact requirements. |
|
|
 |
Can our department add additional space to our proposed station to meet future needs for dormitories, equipment storage, vehicle bays or training areas? |
|
|
|
Adding bays to meet future needs are eligible. However, as with any other request, the additional space must be justified in the narrative. Panelists will be looking at your department characteristics, so if you are asking for a 10 bay station, and you currently have three, you will need to justify the extra capacity. |
|
|
 |
Our department has a vehicle on order. Can we build an extra bay to house the apparatus? |
|
|
|
Yes, but only if the vehicle has already been ordered. |
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| Contracts and Procurement |
|
 |
In order to be ready to start on our fire station project, we have already hired an architectural firm and a construction manager. Specific to the timing of contracts, if successful in this grant process, what items would be eligible or ineligible for reimbursement? In particular, if we do our due diligence to be "shovel ready" by early summer, are we jeopardizing our ability to receive full reimbursement for items that would be paid or budgeted for prior to the application of this grant? |
|
|
|
Any pre-award costs incurred are not reimbursable under the grant. The cost incurred for fees paid to the architect to design the building pre-award are not eligible. Signing a contract with a construction manager to organize and facilitate the pre-construction work and then manage the project is fine. The costs incurred for paying the manager PRIOR to award are not eligible, but his/her post-award costs are eligible. The costs to pay the architect to modify the design of the structure to include sprinklers would be eligible if incurred after award. |
|
|
 |
The program guidance encourages applicants to be ready to start their projects as soon as possible after being notified of the award. But, the "Grantee Responsibilities" section of the program guidance also states all bidding activities must be conducted during the grant's period of performance, i.e., after award. These statements or requirements seem to be contradictory. In order to be ready to start our project as soon as after notification of award, can we sign a contract with a contractor? |
|
|
|
DHS' concern regarding the conduct of the procurement prior to award is the procurement may not have satisfied the competitive requirements outlined in the program guidance and Federal procurement regulations. However, due to the need to expedite these projects, we will not discount or disallow contracts entered into prior to award if we are satisfied the contract was properly competed in accordance with the program guidance and 44 CFR Part 13. Grantees may be required to provide their procurement documentation to show that competition was in fact instilled in their process. |
|
|
 |
What is considered a cost overrun? |
|
|
|
Costs in excess of the contracted price. |
|
|
 |
Can the department or Authority Having Jurisdiction (AHJ) oversee the General Contractor and/or their subs to facilitate the completion of the project in order to save money on the project management costs? Or are we required to hire a general contractor for that task? |
|
|
|
The practice of using town employees to oversee construction projects is allowable. However, if you plan to charge the grant for salaries of any employees, you must include the expense in your application for the panelists to consider those expenses. |
|
|
 |
If an architect consults on the application, are they prohibited from participating in the project post-award? |
|
|
|
No. They are not disqualified, but they must enter the process after award as set forth in the procurement requirements. They would have to be selected through a competitive bidding process. |
|
|
 |
We have the property, plans for a station and bids for cost analysis. Our project is shovel- ready to start. We have also secured funding at a local bank, but if we receive the grant, we do not need the bank loan. We will hire 12-15 new full-time career firefighter paramedics. Will we be eligible for funding since this project is slated as a go in an area where we need the station to decrease current response time and to meet NFPA standards? |
|
|
|
If your community and your bank are willing to delay the start of the project for several months, your project is eligible as long as you DO NOT start the construction prior to award. The environmental assessment must be completed before your project can commence. DHS will inform you when you can start your project. |
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| Cost-Share |
|
 |
Are applicants required to provide a cost-share or matching funds for these grants? |
|
|
|
No. There is no cost-share requirement for these grants. However, applicants may offer to contribute toward the total project budget. Although the lack of a contribution will not count against any applicant, those applicants who state in their applications that they will contribute funds to the budget will receive higher consideration than those who do not; the higher the contribution, the higher the level of consideration. Any applicant who commits to making a financial contribution in their application will be required to provide that cost-share at the same level of financial commitment as a condition of receiving their award . Furthermore, if the grantee fails to make the financial contribution as promised in their application, the grantee may be required to repay any grant funds received. Applicants should also be aware that the costs associated with the ineligible portions of their construction projects--such as the costs related to a ballroom or law enforcement annex--will NOT be accepted as part of their financial contribution. |
|
|
 |
Can applicants use the cost of non-operational space as their cost-share? |
|
|
|
No. Only eligible costs can be charged to the grant and non-operational space is not eligible. When an applicant is pledging to provide funds in the form of a cost-share, those costs will be applied toward the eligible/operational space and must be a hard cash match. |
|
|
 |
Our local governing body will match whatever funding we receive, but we are unsure of the exact amount of our cost-share contribution at the time of application? How do we provide that information for our application? |
|
|
|
A cost-share is not required for the Station Construction grants. However, in the Request Details section of the application, question 23 asks you to provide your proposed cost-share amount. If you do not know how much your cost-share will be at the time of application, do not enter a proposed amount. Please make the panelists aware in the narrative of your application by explaining that your community is willing to contribute, and if awarded, at the time of award, you can negotiate the amount of you cost-share contribution with the Grants Management Office. |
|
|
 |
Will additional consideration be given for departments who are unable to provide a cost-share but who can contribute man-hours toward finishing a project? |
|
|
|
Other than in the narrative, there is no opportunity to relate that you have members who would be willing to donate time to complete the project. You are encouraged to relay this information as it may add to the cost-benefit of the project. However, as good intentions are often unfulfilled, it is impossible to know how the panelists would view such a pledge. |
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| Eligible Items and Costs |
|
 |
The guidance is silent on whether station alerting systems and station backup generators be considered costs directly related to the daily operation of the fire department and thus eligible. Are these items eligible? |
|
|
|
We expect these stations to be fully functional. But, we're not going to build palaces just to be building palaces. If an item is nice to have, but not relevant to NFPA, we may not fund it without specific justification. |
|
|
 |
We will pay for paving and fencing, but landscaping is listed specifically as ineligible. Landscaping is often required as a condition for obtaining a permit, so why is it not eligible? |
|
|
|
Paving is directly related to the operation of the new building, thus eligible. However, the paving will be limited to operational functions and staff parking, but will not include large areas for community purposes. For projects that do not involve new construction, we will not re-pave paved areas unless such an activity was fully justified in the application as critical to the implementation of the project. Pavement damaged during construction or renovation can be repaired and charged to the grant. Fencing and landscaping is not eligible. |
|
|
 |
Station signage, station flagpole, station traffic control systems – are they eligible expenses? They may be required by code and considered non-operational items, but what is a fire station without a flagpole? |
|
|
|
Like fencing, a flagpole is not operational, thus would not be eligible. |
|
|
 |
Are hose towers an eligible expense for the SCG? |
|
|
|
Yes, they are considered to be contributory to the departmental operations. |
|
|
 |
Can the fire department construction funding be used to build a fire department building large enough to house a police department as well? |
|
|
|
The cost for space for any activities not directly related to the daily operation of the fire department - such as community meeting space, ballrooms administrative support, or other governmental functions, such as police or emergency management annexes - are not eligible for Federal funding from the SCG grants. These types of amenities, facilities, or functions may be included in the overall design and construction of the station project, but the costs would not be eligible for Federal reimbursement. Eligible costs will be limited to the cost of the operational space for the fire department. The cost for the non-operational space will be assessed, quantified and removed from the overall project's costs. The cost of the non-operational space will be based on square footage of the identified ineligible space compared to the overall project square footage of the structure. |
|
|
 |
If the department has identified a site to build a new fire station, but the site is located in a flood plain, can the department take steps to mitigate the flooding issue by raising the level of the property to keep the building above the flood level? |
|
|
|
With regard to protection of wetlands and floodplain management, DHS will not support development or new construction or substantial renovation in wetlands, designated floodways or velocity zones. Fire stations can be newly constructed or undergo substantial renovation in flood plain areas, provided that the clearance process steps of Executive Order 11988 is followed (e.g., no other reasonable alternative location exists) and provided that all appropriate flood plain management requirements of National Flood Insurance Program participation are followed. This would include protection of the new construction or substantial renovation. Fire stations are considered critical facilities for flood plain management purposes. Therefore, new construction or major renovations must be protected to the 500 year flood level. DHS will take the location of the modification and/or new construction into account when evaluating the viability of any project. |
|
|
 |
If a grantee previously started a construction project but had to halt construction because of bankruptcy or they lost funding for another reason, couldn't they just apply to finish the project under the 'renovation' priority? |
|
|
|
No, because the Program Office would not be able to perform a proper environmental assessment. For a project to be considered eligible for renovation, it is a requirement that the structure was occupied prior to the proposed renovation. In these cases, the Program Office may require the applicant to provide a certificate of occupancy before the building can be considered eligible under the renovation activity. |
|
|
 |
Under new construction and remodeling existing stations, are vehicle exhaust systems required? |
|
|
|
If you indicated in your application that you would build your station to be in compliance with NFPA 1500, then you are required to comply. Exhaust systems, smoke-alarm systems and sprinklers are required to comply with NFPA 1500. But, vehicle-mounted exhaust systems are ineligible. |
|
|
 |
Are the environmental assessments paid for by FEMA or by the grantee? |
|
|
|
Expenses to comply with EHP requirements are an eligible cost under the SCG program. |
|
|
 |
Will the SCG allow for the purchase of an existing building and the renovation of it for a fire station? |
|
|
|
Your department or municipality may purchase the existing building and use the grant funds to convert the structure into a fire station, but you may not use the grant funds to purchase real estate. |
|
|
 |
Are things such as land clearance, driveways, well and septic eligible expenses under the SCG? We also need water holding tank and a fuel tank. Are those items eligible? |
|
|
|
All of the items you listed are eligible except the fuel tank. The environmental implications and clearances required for such a feature would severely delay the project. Therefore, we would be unwilling to fund such a feature. |
|
|
 |
We want to renovate our volunteer department building to provide sleeping quarters. Is this eligible for funding under the SCG? |
|
|
|
Providing sleeping quarters for any department translates into an opportunity to cut response times. Cutting response times to comply with NFPA 1710 and NFPA 1720 is a high priority for the SCG. |
|
|
 |
What if a fire department shares a facility with a police department? Is that space considered eligible for a renovation? |
|
|
|
If a station has multiple disciplines (e.g., law enforcement and fire), the space that is dedicated to law enforcement is not eligible, and the cost for common space between the two disciplines would be pro-rated. |
|
|
 |
The Program Guidance lists EMS organizations as ineligible. How does this affect departments that share facilities with Emergency Medical Service departments? How does this affect departments that offer Emergency Medical Services through the fire department? |
|
|
|
If a fire department provides EMS services as well as fire suppression, then the space dedicated to EMS is eligible. However, if the EMS organization is a separate entity, i.e., is not part of the fire department, then the space dedicated to EMS is ineligible - such space can be a part of the project, but not chargeable to the grant. |
|
|
 |
The Program Guidance lists Emergency Operations Centers as ineligible. Does this include training rooms that are also intended to function as Emergency Operations Centers? |
|
|
|
The Program Office believes training is critical, thus we encourage fire departments to include space for training in the design of their modification or new construction. However, the eligible training space is limited to 600 square feet. To the extent that the training space can be used for alternate operational uses is good. |
|
|
 |
The Program Guidance includes "administrative support" as an ineligible item. What is considered as Administrative Support? Does this include the fire chief and other staff offices, building inspection departments supervised by the fire department and fire safety education offices and functions? |
|
|
|
The administrative costs listed under "Other Allowable Costs" are relative to the administration, documentation, and record-keeping required for the grant. Regarding space, we recognize that for any organization or business there is a need to allow space for management and/or command. We will not dictate how much space or how little space is necessary or allowable. However, as with ALL space proposed for the new station, the command space should be justified in the application. |
|
|
 |
What is considered operational space only? |
|
|
|
Space that directly contributes to the operations of the department. |
|
|
 |
If the structure was built after 2003, according to existing construction rules for modifications or renovations, will the project be eligible? |
|
|
|
Under AFG, structures constructed after 2003 are not eligible for modification funding. There is no such restriction under SCG. However, such applicants will have a more difficult task of justifying a project that will include facility enhancements that should have been included in the original construction. |
|
|
 |
Regarding property ownership, can our department construct a facility on land endowed to the grantee? What if we are in the process of securing the land at the time of application? |
|
|
|
If your department does not own the land where you are proposing to build your station, you may still apply for the SCG. This may provide you with the opportunity to secure the land. If a panel of your peers deems that your project is worth funding despite the fact that you don't own the land at the time of application, DHS will assess your ownership arrangements during technical review to determine if your project is worth funding. For example, if you only have three years left on a lease, it may be that DHS will not deem it feasible to fund your project. If, however, you have 98 years left on a 99-year lease, DHS may determine that the project is worthy of funding. |
|
|
|
|
|
|
 |
 |
 |
 |
|
|
 |
 |
 |
 |
| LEED and Sustainability |
|
 |
What is sustainability, and how does it affect me as an applicant? |
|
|
|
Sustainability is something every applicant needs to understand during the application period, and be prepared to implement it in your construction project if awarded as per Executive Order 13423.
The SCG Program Guidance provides the following general guidelines: Infrastructure projects must incorporate the sustainable practices listed in the Guiding Principles for Sustainable New Construction and Major Renovations as required in Executive Order 13423. In addition, infrastructure projects should achieve United States Green Building Council Leadership in Energy and Environmental Design (LEED™
) registration at certified, Silver, Gold, or Platinum level. Achieving LEED™
certification does not automatically mean achievement of the requirements Guiding Principles for Sustainable New Construction and Major Renovations. This is why the spread sheet tracks completion of requirements in the Guiding Principles for Sustainable New Construction and Major Renovation. It is important to describe plans to achieve both conditions.
For additional information, visit: http://www.ofee.gov/eo/eo13423_main.asp
|
|
|
 |
What is the Sustainability ARRA Environmental Spreadsheet? |
|
|
|
The Sustainability Excel Spreadsheet is not required for your application. If you are awarded an SCG grant, it is mandatory to follow all the requirements of sustainability and LEED when fulfilling the scope of your project during construction or renovation.
For additional information, visit: http://www.ofee.gov/eo/eo13423_main.asp |
|
|
 |
What is LEED? |
|
|
|
LEED is an internationally recognized certification system that measures how well a building or community performs across the metrics of: energy savings, water efficiency, CO2 emissions reduction, improved indoor environmental quality, and stewardship of resources and sensitivity to their impacts. Developed by the U.S. Green Building Council (USGBC) , LEED provides building owners and operators a concise framework for identifying and implementing practical and measurable green building design, construction, operations, and maintenance solutions. LEED is flexible enough to apply to all building types – commercial as well as residential. It works throughout the building lifecycle, design and construction, operations and maintenance, tenant fit out, and significant retrofit. And, LEED for Neighborhood Development extends the benefits of LEED beyond the building footprint into the neighborhood it serves. |
|
|
 |
What version of this standard will we be responsible for if we are awarded an SCG grant? |
|
|
|
The SCG Program Guidance states:
The following describes the requirements to meet the energy requirements for ARRA projects. These requirements apply to all construction and major renovation projects. For each item below, select "Requirement Met" or "Requirement Not Met," and then explain how this was determined. Answers such as "Not Applicable" or "Does Not Apply" are not appropriate. It is recognized, in some instances, not meeting the requirement is justified. The only explanation for "Requirement Not Met" must be in the justification. For example, a renovation project where existing electrical infrastructure are not modified, and electricity meters are already in place, installing advanced meters would not be necessarily.
If you have questions on levels of certification or variances of these levels of certification, visit the United States Green Building Council at http://www.usgbc.org/Default.aspx .
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
|
|
|
|
 |
 |
 |
 |
| Budget Questions |
|
 |
I would like to submit more than one project in my SCG application. Do I need to submit a separate budget for each project? |
|
|
|
Yes, for each project submitted, a budget must be provided. Each project's budget should consist of budget line items you complete by clicking on the "Build Project Budget" link on the "Request Details" screen for each specific project. |
|
|
 |
If I have an expense that is a flat fee, how do I enter the unit of measure for that budget line item? |
|
|
|
You would select "Unknown" from the drop-down menu in Question #4 of the "Add Fire Station Construction Budget Item" screen. For Question #5, you would enter a "1" as the unit quantity, and for Question #6, enter the unit cost as the total for the budget item, e.g. the budget item's flat fee. |
|
|
 |
What information should I provide in the text box for Question #7 for the budget item narrative? |
|
|
|
For each type of budget item, you need to provide specific information. The detail that needs to be included for each type of budget item is listed below:
- Personnel : List each position by title and name of employee, if available. Show the annual salary rate and the percentage of time that will be devoted to the project. Compensation paid for employees engaged in grant activities must be consistent with that paid for similar work within the applicant organization.
- Fringe Benefits : Fringe benefits should be based on actual known costs or an established formula. Fringe benefits are for personnel, which needs to have its own separate budget item, and should only be for the percentage of time devoted to the project.
- Travel : Itemize travel expenses of project personnel by purpose (e.g., staff to training, field interviews, advisory group meeting, etc.). Show the basis of computation (e.g., six people to 3-day training at $X airfare, $X lodging, $X subsistence). Identify the location of travel, if known. Indicate source of Travel Policies applied: Applicant or Federal Travel Regulations.
- Equipment : List non-expendable items to be purchased. Non-expendable equipment is tangible property having a useful life of more than one year and an acquisition cost of $5,000.00 or more per unit. (Note: Organization's own capitalization policy and threshold amount for classification of equipment may be used). Expendable items should be included in the "Supplies" category.
- Supplies : List items by type (office supplies, postage, training materials, copying paper, and other expendable items such as books, hand held tape recorders) and show the basis for computation. (Note: Organization's own capitalization policy and threshold amount for classification of supplies may be used). Generally, supplies include any materials that are expendable or consumed during the course of the project.
- Contractual : Provide a description of the product or services to be procured by contract and an estimate of the cost. Contractual costs should be for all non-construction related contracts supporting the project. Applicants are encouraged to promote free and open competition in awarding contracts.
- Construction : All construction costs should be entered separately using the drop-down menus. To avoid overlap between construction costs and contractual costs, construction costs should be for all costs and contracts directly related to construction. Applicants are encouraged to promote free and open competition in awarding contracts.
- Other Costs : List items (e.g., rent, reproduction, telephone, janitorial or security services) by major type and the basis of the computation. For example, provide the square footage and the cost per square foot for rent and provide a monthly rental cost and how many months of rent.
Indirect Costs : Indirect costs are allowed only if the applicant has a federally approved indirect cost rate. A copy of the rate approval, (a fully executed, negotiated agreement), is required. If the applicant does not have an approved rate, one can be requested by contacting the applicant's cognizant Federal agency, which will review all documentation and approve a rate for the applicant organization.
|
|
|
|
|
 |
 |
 |
 |
|
|